Page 1
100004
KGB SERIES
Service Literature
2 to 7-1/2 ton
7 to 26 kW
May 2020
KGB024 through 090
The KGB packaged gas units are available in standard
cooling efficiency (024, 030, 036, 048 060, 072, 074 and
090). Cooling capacities range from 2 to 7-1/2 tons (7 to
26kW).
KGB024, 030, 036, 048, 060, 072, 074 units are avail
able in 65,000 BTUH heat capacity /KGB036, 048, 060,
072, 074 and 090 units are available in 108,000 BTUH
(105,000 BTUH in earlier built units ) heat capacity.
KGB048, 060, 072, 074 and 090 units are available in
150,000 BTUH (44 kW) heat sizes. Two stage heat is
available in units with 108,000 (105,000 in earlier built
units) and 150,000 BTUH capacities. Gas heat sections
are designed with aluminized steel tube heat exchang
ers.
Information contained in this manual is intended for use by
qualified service technicians only. All specifications are
subject to change. Procedures outlined in this manual are
presented as a recommendation only and do not super
sede or replace local or state codes.
If the unit must be lifted for service, rig unit by attaching four
cables to the holes located in the unit base rail (two holes at
each corner). Refer to the installation instructions for the
proper rigging technique.
WARNING
Improper installation, adjustment, alteration, service
or maintenance can cause property damage, person
al injury or loss of life. Installation and service must
be performed by a licensed professional installer (or
equivalent), service agency or the gas supplier.
WARNING
Electric shock hazard. Can cause injury
or death. Before attempting to perform
any service or maintenance, turn the
electrical power to unit OFF at discon
nect switch(es). Unit may have multiple
power supplies.
CAUTION
As with any mechanical equipment, contact with
sharp sheet metal edges can result in personal in
jury. Take care while handling this equipment and
wear gloves and protective clothing.
CAUTION
Electrostatic discharge can affect electronic
components. Take precautions during unit instal
lation and service to protect the unit's electronic
controls. Precautions will help to avoid control
exposure to electrostatic discharge by putting
the furnace, the control and the technician at the
same electrostatic potential. Neutralize electro
static charge by touching hand and all tools on an
unpainted unit surface, such as the gas valve or
blower deck, before performing any service pro
cedure.
ELECTROSTATIC DISCHARGE (ESD)
Precautions and Procedures
Table of Contents
Options Page 2.......................
Specifications Page 6..................
Spec. Gas Heat / High Altitude Page 13...
Blower Data Page 14...................
Electrical Data Page 31.................
I Unit Components Page 35.............
II Placement and Installation Page 48.....
III Start Up Operation Page 48...........
IV Charging Page 50...................
V System Service Checks Page 60.......
VI Maintenance Page 62................
VII Accessories Page 63................
VIII Diagrams Page 69..................