EasyManua.ls Logo

Leopard Catamarans 40 - Page 97

Leopard Catamarans 40
201 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-25 Optional Extras | 89
1. Operating the Air-conditioning
through the Genset
OpenallAirconditioning&Gensetsalt
water inlets
SwitchGensetcircuitbreakertoon
position
StartGensetallowtorunfor2minutes
minimumbeforeswitchingonAir-con
units.SwitchTransfercircuitbreakerto
on position
SwitchonselectedAir-concircuit
breaker
NOTE:Ifmorethanoneunitisrequired
donotswitchthemallonatonce.The
initialstart-uploadcouldcausethe
Gensettotrip.Allow1-2minutesbetween
switchingoneachcircuitbreaker.Thiswill
allowtheGensettotakeupthestart-up
loading.OncetheAir-conisrunningselect
requiredtemperatureattheControlpanel
2. Operating the Air-conditioning
through both the Shore Power Cables
PluginShorepowercables
SwitchonShorepowercircuitbreaker
OpenallAir-consaltwaterinlets
SwitchonselectedAir-concircuit
breaker
OncetheAir-conisrunningselect
requiredtemperatureattheControl
panel
3. Operating the Air-conditioning
through Single Shore Power Cable
PlugintheShorepowercable
SwitchonShorepowercircuitbreaker
SwitchontheTransferCircuitbreaker
OpenallAir-consaltwaterinlets
SwitchonselectedAir-concircuit
breaker
OncetheAir-conisrunningselect
requiredtemperatureattheControl
panel.
Air-conbehindportcorridor
inspectionpanel

Table of Contents