17
6
Setup
6.1 Transport
For a safe transport, observe the following:
Ensure that no cables are run over when moving a bed.
Ensure that the mains cable is attached with a hook (at the head end of the bed).
Ensure that the castors are unlocked before moving the bed during the loading/unloading process
(see Castor Control and Bed Transport).
Move the bed only on suitable floor surfaces.
Suitable surfaces:
Tile
Hard linoleum
Poured flooring
Unsuitable surfaces:
Too soft, unsealed or defective flooring
Soft wooden flooring
Soft and porous stone floors
Carpeted floors with underlay
Soft linoleum
For longer distances, ensure that the castor steering function (main control) is activated.
Ensure that the brakes are released while moving the bed.
6.2 Setup
Set up the bed as follows:
Unpack the bed.
Check the delivery (see Scope of Delivery and Bed Variants).
Install equipment and accessories (see Assembly).
In case of delivery with dismantled bed ends, mount the head and foot ends (see Assembly).
Set up the bed only on a suitable floor surface (see Transport).
Ensure that the mains cable does not collide or get stretched when adjusting the bed.
Check that the plug is inserted correctly.
Do not leave any extension cords or power strips loose on the floor.
Ensure that all of the required mechanical and electrical prevention mechanisms are available on site.
There is no mains switch on the bed, i.e. the mains cable is the only means to isolate the bed from the
mains.
Ensure that the mains cable is always accessible.
Have the separable plug of the mains cable changed and maintained only by qualified and trained
service technicians authorised by the manufacturer.