19
7
Assembly
Risk of injury when working on the bed!
Ensure that the bed is disconnected from the mains connection prior to assembly,
disassembly and maintenance.
Ensure that the castors are locked prior to assembly, disassembly and mainte-
Warn
ing
nance.
Material damage due to incorrect assembly!
Ensure that assembly is performed by seller´s customer service or trained hospital
personnel only.
Caution
1 2 3 4
5
6
7
8
9
10
1. Removable foot board with safety lock
2. Four-part mattress platform with Ergoframe® system
3. Split siderail – middle section with integrated control panels for patient
4. Split siderail – head section
5. Multiboard
6. Nurse call
7. Removable head board
8. CPR control lever – backrest release
9. X-ray cassette holder
10. Accessory holder
11. Foot controls – height adjustment
12. Siderail release lever
13. Foot controls – lateral tilt
14. Castor control lever
15. Bi-lateral accessory rail
16. Mobilift® handles
17. Castors Ø 150 mm
18. Bumpers