4.4
4.4
4.4
4.4 WORKING
WORKING
WORKING
WORKING OF
OF
OF
OF LOADER
LOADER
LOADER
LOADER
4.4.1
4.4.1
4.4.1
4.4.1 PREPARATION
PREPARATION
PREPARATION
PREPARATION BEFORE
BEFORE
BEFORE
BEFORE WORKING
WORKING
WORKING
WORKING
� Before the commencement of the working, use the loader to flatten the working place ,
remove crowing portions, fill depressions, and remove the ground surface which is
wet and slippery. Clear away all large and sharp stones on the working place, so as
to p revent the tires from being scratched.
� If using the loader to load materials onto or unload materials from a truck or hopper,
adjust the limit height of the caging device of the lift arm on the basis of the height of
the truck or hopper, so as to ensure that the bucket may safely enter into an
d
exit
from the truck or hopper and to avoid the impact on truck or hopper imposed
by
materials discharged from an excessively high position.
4.4.2
4.4.2
4.4.2
4.4.2 GENERAL
GENERAL
GENERAL
GENERAL TECHNIQUES
TECHNIQUES
TECHNIQUES
TECHNIQUES
Common
Common
Common
Common shovel-loading
shovel-loading
shovel-loading
shovel-loading method
method
method
method
� The common shovel-loading method is suitable for the loading of bulk materials.
� Make the loader approach the materials
at
the speed under forward gear 2, align the
middle portion of the bucket with the material pile, hold the steering wheel with your
left hand, and operate the pilot joystick with your right hand so as to lower the li
ft
arm
to the position which is 500mm above the ground.
� When the loader is about one meter away from the material pile, lower the lift arm
again and make the bucket contact with the ground, and then change the forward
gear 2 to forward gear 1.
NOTE:
NOTE:
NOTE:
NOTE: When
When
When
When making
making
making
making the
the
the
the bucket
bucket
bucket
bucket contact
contact
contact
contact with
with
with
with the
the
the
the ground,
ground,
ground,
ground, be
be
be
be sure
sure
sure
sure not
not
not
not to
to
to
to make
make
make
make
the
the
the
the bucket
bucket
bucket
bucket apply
apply
apply
apply a
a
a
a too
too
too
too large
large
large
large force
force
force
force onto
onto
onto
onto the
the
the
the ground,
ground,
ground,
ground, otherwise
otherwise
otherwise
otherwise the
the
the
the unnecessary
unnecessary
unnecessary
unnecessary
travelling
travelling
travelling
travelling resistance
resistance
resistance
resistance may
may
may
may occur.
occur.
occur.
occur. In
In
In
In addition,
addition,
addition,
addition, the
the
the
the front/rear
front/rear
front/rear
front/rear frames
frames
frames
frames of
of
of
of the
the
the
the loader
loader
loader
loader
shall
shall
shall
shall be
be
be
be placed
placed
placed
placed strai
strai
strai
strai ghtly,
ghtly,
ghtly,
ghtly, and
and
and
and there
there
there
there must
must
must
must be
be
be
be no
no
no
no included
included
included
included angle
angle
angle
angle between
between
between
between front
front
front
front
and
and
and
and rear
rear
rear
rear frames.
frames.
frames.
frames.
� Push down the accelerator pedal so as to insert the bucket into the material pile with
full force; when the loader cannot move forward any more, push leftwards the pilot
joystick so as to turn the bucket backwards, and then pull the control handle to the
middle position. In this way, the loader may go ahead into the material pile. Repeat
the operation mentioned above until the bucket is filled with the material.
Combined
Combined
Combined
Combined shovel-loading
shovel-loading
shovel-loading
shovel-loading method
method
method
method
� The combined shovel-loading method is suitable for loading relatively hard or sticky
materials. Before the bucket is inserted into the materials, all operations are the same
as those of common shovel-loading method. When the bucket cannot move forwards