DLP-508 363-206-295
1997December1,Issue8of2Page
5:NOTE
betohavecross-connectionsmanualiftestthisforrequiredisCITA
shelf.anyatmade
available?CITaIs
If YES withcontinuethen, 2Step .
If NO toproceedthen, 3Step .
2.
1:NOTE
withequippedisendterminatingoneIf 3STS1E topackscircuit
withequippedisendterminatingothertheandserviceEC-1provide
3DS3 thefromperformedistesttransmissionDS3thepacks,circuit
andCITtheIfend.terminatingDS3 test-trmsn-t3: iscommand
terminatingEC-1theatareyouandtesttheperformtousedbeing
theend, rlgn toendDS3theintologtousedbemaycommand
theusingtesttheperform test-trmsn-t3: command.
2:NOTE
withequippedareendsterminatingbothWhen 3STS1E packs,circuit
DS3Forperformed.bemayteststransmissionDS3orDS1either
withequippedtemporarilybemayendonetests, 3DS3 packscircuits
forteststransmissionperformTotests.transmissiontheperformto
theremoveconfiguration,this 3STS1E anperformend,neartheat
(update upd theinstalland), 3DS3 configurationThispack(s).circuit
areteststheAfterdirection.MUXtheintestedbeonlymay
update,anperformpacks,circuittemporarytheremovecompleted,
thereinstalland 3STS1E packs.circuit
near-endtheAt DDM-2000 thetoCITtheconnect, CIT Usertheonjack
required.ifPanel,
Reference: DLP-521