DLP-546 363-206-295
1997December1,Issue8of4Page
circuitororderworkonspecifiedassameisconfigurationsystemVerify2.
order.
fornodes(drop)terminatingthedetermineorder,circuitororderworkFrom3.
established.beingservicethe
4.
1:NOTE
pass-throughofconsistcross-connectionsconfigurations,ringIn
Forcross-connections.terminatingthetoadditionincross-connections
Node5,andNode1atarenodesterminatingtheif1,Figureinexample
otherallatmadebetohavewillcross-connectionspass-throughthen
6).and43,2,(Nodesnodes
2:NOTE
inrulesfollowingtheuseshouldyouconfigurations,ringIn
ring:eachincross-connectionsestablishing
samethefrompresent)ifDRI,(includingconnectionsdropAll1.
STS-1.allsame,theprovisionedbemusttimeslotSTS-1
bemustringtheinnodesallrings,path-switchedSTS-1On2.
cross-connections.STS-1asprovisioned
thedetermine1,Stepinmadesketchtheandorder,circuitorder,workFrom
established.beingservicethefornodespass-through
theUse5. rtrv-eqpt: isshelfeachthatverifytonodeeachatcommand
theisexample,Forestablished.beingservicetheforequippedproperly
withequippedendsterminatingtheatserviceforusedbeingslotorgroup
properthe 3DS3 established?beingisserviceDS3ifpackscircuit