EasyManua.ls Logo

Lynx RaveTM RE 600 E-TEC - Break-In Period

Lynx RaveTM RE 600 E-TEC
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BREAK-IN PERIOD
Engine
CAUTION: A break-in period of
10 operating hours 500 km
(300 miles) is required befo re
running the snowmobile at full
throttle.
During break-in period, maximum
throttle shou ld not exceed 3/4 op en -
ing. However, brief full acceleration
and speed variations contribute to a
good break-in.
CAUTION: Engine overheating,
continued wide open throttle runs
and prolonged cruising without
speed variations should be avoid-
ed, this can cause engine damage
during the break-in period.
593SS and 800R Engine Only
To assure additional protection during
the initial engine break-in, 500 m L of
recomm e nd e d injection oil sh o uld be
added to fuel for the first full filling o f
fuel tank. Have spark plugs cleaned
after engine break-in.
Belt
A new drive belt requires a break-in pe-
riod of 50 km . Avoid strong ac celera-
tion/deceleratio n, pulling a load or high
speed cruising.
10-Hour Inspection
NOTE: The 10-hour inspec tion is at the
expense of the snowmobile owner.
As with any precision piece of me -
chanical equipment, we suggest that
after the first 10 hours of operation or
500 km, whichever comes firs t, your
snowmobile be checked b y an autho-
rized LYNX de aler. This insp e ction will
also give you the opportunity to dis-
cuss the unanswered questions you
may have encountered during the first
hours of operation.
_____________________
65

Table of Contents

Related product manuals