SETUP AND INSTALLATION MLC300 OPERATOR MANUAL
4-78
Published 11-20-19, Control # 234-19
Figure 4-57
Item Description
1 Shackle (2): 25 t (28 USt)
2 Lifting Sling (4): 2,8 m (9 ft) long
3 Self-Erect Cylinder
4Trailer
5 Insert (with sheaves)
6 Lifting Lug (4)
7 Wire Rope Guide (Drum 2, 3, 6 Option)
8 Forklift Channel (2)
9 Pin with Safety Pin (4)
10 Lifting Lug (4)
View A
6,5 m (21 ft) Radius
View B
Lifting Arrangement for All Inserts
View C
View D
Top End
WORKING
(4)
SHIPPING
View E
STORED
OR
Standard Width
OR 3.5 m Wide

Table of Contents

Other manuals for Manitowoc MLC300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC300 and is the answer not in the manual?

Manitowoc MLC300 Specifications

General IconGeneral
BrandManitowoc
ModelMLC300
CategoryConstruction Equipment
LanguageEnglish

Related product manuals