Manitowoc Published 11-20-19, Control # 234-19 4-87
MLC300 OPERATOR MANUAL SETUP AND INSTALLATION
3
1
4
Install Boom Top
See Figure 4-62 for the following steps.
1. Lift the boom top (15, Views A and B) off the trailer in the
same manner the inserts were removed from the
trailers.
2. Lift the boom top (15, View D) into position and engage
the fixed horizontal pins (11, View C) with the hooked
connectors (12) on the insert (10).
3. Lower the boom top (15, View E) until the bottom
connector holes are aligned.
4. Remove the pins (13, View E) from the storage tubes
(14) and install the pins in the bottom connector holes.
5. Block under the boom top stands (16, View D) if needed.
6. Disconnect the lifting slings.

Table of Contents

Other manuals for Manitowoc MLC300

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC300 and is the answer not in the manual?

Manitowoc MLC300 Specifications

General IconGeneral
BrandManitowoc
ModelMLC300
CategoryConstruction Equipment
LanguageEnglish

Related product manuals