EasyManua.ls Logo

Miele PG 8591 - Page 35

Miele PG 8591
152 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Application technology
35
... middle position:
Move the roller brackets on both sides to the middle position and
secure them firmly.
Position the stainless steel plate over the openings in the water
supply pipe so that one of the outer openings is covered. Secure
the stainless steel plate at the top or bottom with 2 screws. Place
the water connector in the middle opening of the stainless steel
plate so that the outer opening is covered. Secure the water
connector with 4 screws.
... lower position:
Move the roller brackets on both sides to the top position and
secure them firmly.
Position the stainless steel plate over the openings in the water
supply pipe so that the lower opening is covered. Secure the
stainless steel plate at the bottom with 2 screws. Place the water
connector in the upper opening of the stainless steel plate so that
the middle opening is covered. Secure the water connector with 4
screws.
Then check:
Replace the upper basket on the rails and push it in carefully to
check that the water connection is positioned correctly.

Table of Contents

Related product manuals