PERFORMANCE TEST RESULTS
Monitor system performance carefully, under all anticipated operating conditions.
A. When the HYDRO+ performs exactly as required, programming is complete.
B. If alternate Reading units, failsafe action, relay, or mA output operation is
desired, proceed to APPLICATIONS and/or PARAMETERS as required.
C. Should system performance not meet installation requirements, (or the "LOE"
display persists after start up), proceed to TROUBLESHOOTING .
If all operating conditions cannot be observed during the System Performance
Evaluation, refer to PARAMETERS Reading Measurement (P920). Perform a
Reading Measurement simulation to verify programming.
Conduct a System Performance Evaluation following any installation modification or
programming (parameter) alteration.
PARAMETERS
APPLICATIONS
TROUBLESHOOTING
PARAMETERS
OPERATION
PL-507 37