Configuration and function
1-8
Pen line rubber
Plotting and cutting are performed on
the pen line rubber
.
If you want to perform POUNCING and
dotted line cutting, install the pen line.
When performing POUNCING or HALF CUT.
1
Remove the pen line rubber.
2
Install the pen line.
• Install the pen line with slot side up.
Be careful of following when install the pen line rubber.
• Pen line rubber is designed 10mm shorter than plotter slot.
• When install the pen line rubber, make sure to push it into the slot softly and avoid stretch it
forcibly.
• If pen line is stretched forcibly, the edge of pen line comes off and may decline the cutting
quality.
• Store the replaced pen line.
• The pen line is an article of consumption. Replace it with a new one if necessary.
pen line rubber
pen line rubber
gap
(1)Insert the flathead screwdriver or equivalent tool
into the gap shown in the above illustration.
(2)Raise a pen line rubber.
slot