EasyManua.ls Logo

NETGEAR ProSAFE M4300 series - Chapter 3 Installation; Step 1: Prepare the site

NETGEAR ProSAFE M4300 series
59 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Installation
This chapter describes the installation procedures for the switch. Switch installation involves the steps described
in the following sections:
Step 1: Prepare the site
Step 2: Protect Against Electrostatic Discharge
Step 3: Unpack the Switch
Step 4: Install the Switch
Step 5: Check the Installation
Optional Step 6: Install SFP Transceiver Modules
Step 7: Apply AC Power and Check the LEDs
Optional Step 8: Install a Second Power Supply Unit
Optional Step 9: Connect a Redundant Power Supply
Optional Step 10: Connect a Console to the Switch
Optional Step 11: Replace a Half-width Switch in a Rack
36
Managed Stackable Switch Series M4300

Table of Contents

Related product manuals