I/O connectors (labeled 1-10 and
11-20)
Installation
3-34
Part 1107600_03
2014 Nordson Corporation
Installing Melter Inputs (contd)
See Figure 3‐6.
2. Connect each pair of input wires to the appropriate terminals (9 through
20) on the I/O connectors. The connectors are preinstalled on terminal
XT7 on the I/O expansion card. Table3‐8 lists the terminal numbers that
correspond to each input.
11-20
1-10
Outputs
Inputs
7
10
9
8
7
6
5
6
5
4
Figure 3-6 Wiring inputs