EasyManua.ls Logo

Omron YRC - Chapter 3 Installation; 2. Installing the robot controller; 3. Connecting to the power; 5. Robot connections

Omron YRC
260 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Installation
1. Transport, unpacking 3-1
2. Installing the robot controller 3-1
2.1 Installation conditions 3-1
2.2 Installation methods 3-2
3. Connecting to the power 3-3
3.1 Power supply and ground terminals 3-3
3.2 AC power connector wiring 3-4
3.3 Considering power capacity and generated heat amount 3-5
3.4 Installing an external leakage breaker 3-6
3.4.1 Selecting condition 3-6
3.5 Installing a circuit protector 3-6
3.6 Installing an electromagnetic contactor 3-6
3.7 Installinganoiselter 3-7
3.8 Installing a surge absorber 3-7
4. Connecting the absolute battery 3-8
5. Robot connections 3-9
5.1 Connecting the robot cables 3-9
5.2 Noise countermeasures 3-10
6. Connecting the programming box 3-10
7. I/O connections 3-11
8. Connecting the regenerative shorting connector 3-11
9. Connecting the brake power supply 3-12
10. Precautions for cable routing and installation 3-12
10.1 Wiring methods 3-12
10.2 Methods of preventing malfunctions 3-13
11. Checking the robot controller operation 3-14
11.1 Controller wiring 3-14
11.2 Wiring example of emergency stop circuit for operation check 3-15
11.3 Operation check 3-15

Table of Contents

Related product manuals