3. Check and Preparation
3-26
If the number of channels is "3CH", clamp CH1 at phase R, CH2 at phase S and CH3 at
phase T.
Important
・Take extra caution against electric shock.
・Do not insert or remove the sensor head to/from the connector when the measurement
target is clamped.
・The Portable Power Monitor unit power must be ON when clamping a measurement
target.
<Single-phase Three-wire> <Three-phase Three-wire>
Power Supply Side (K) Power Supply Side (K)
Load Side (L) Load Side (L)
<Three-phase Four-wire>
Power Supply Side (K)
Load Side (L)
Branching/Fixing Hook