SECTION 7.0: COMMISSIONING
recording measured values is located in section 7.3.
7.1 HELPFUL HINTS FOR START
-
UP AND COMMISSIONING
Please read these helpful hints before proceeding with the commissioning procedure on the next page.
1.
2.
3.
measured in parallel. If the 4-20 mA signal is already connected to a control system, you must break the connection and
measure the signal in series.
7.2 COMMISSIONING PROCEDURE
1.
being installed in accordance
this manual.
electrical interference and that the enclosure is mounted on a vibration-free
surface.
other signal or power cables.
2.
located in the correct location as required by the plans? Compare actual
straight pipe upstream and downstream of the meter location to recommended
your application. If straight pipe run is very short, consult ONICON PRIOR to
commissioning the meter.
3.
3.14) – (insulation thickness x 2).
4.
the piping system.
5.
programming.
6.
correct ONICON display or
meter serial number (when ordered together).
7.
contact ONICON for assistance before proceeding further.
8.
voltage.
been ordered with a low voltage or high voltage board.
if possible. Otherwise, take the various output readings as quickly as possible.