Test Operation PACD011001C2
88 Test Operation Urban Multi “MX1, ME1 Series” Using R-22
1.9.2 Setting of Cool / Heat by Individual Outdoor Unit System by Cool/Heat Selector
„
Doesn’t matter whether or not there is outdoor - outdoor unit wiring.
„
Set SS1 of the outdoor unit PC board to “OUT / D UNIT.”
„
In setting mode 1, set cool/heat selection to “IND” (factory set).