Test Operation PACD011001C2
456 Test Operation UM Combination “MA1R Series” Using R-407C
Note:
Resetting of power supply switch is necessary after capacity setting.
1 Transmission terminal
Indoor unit, Cool/Heat selector
Outdoor - Outdoor
2 Service monitor LED (Green)
3 Function setting mode switch
and LED
LED
4 Function of setting between
cooling and heating
5 Outdoor unit
Capacity setting switch
Switches for capacity setting when the outdoor unit PC board is replaced
to spare parts PC board.
Refer table below.
HAP
LED-A
SERV. MON.
(V0836)
C/H SELECT
IN/D
OUT/D
SS1
(V0838)
SS2
BDFH
SS3 SS4 SS5
ACEG
(V0848)
SS2 SS3 SS4 SS5
ABCDEFGH
PA-16MA1XPK
„„„ „
PA-18MA1XPK
„„ „ „
PA-20MA1XPK
„„ „ „
PA-24MA1XPK
„„ „ „
PA-26MA1XPK
„„ „ „
PA-28MA1XPK
„„„„
PA-30MA1XPK
„„„„
Capacity setting table