FPΣ User's Manual 
 
8.7 PLC Link 
233 
8.7.5 Monitoring 
When using a PLC link, the operation status of the links can be monitored using the relays 
below. In FPWIN Pro, choose Monitor → Special Relays and Registers → PLC Link 
Status to view the status of each relay. 
To monitor other PLC link status items, such as the transmission cycle time and the number of 
times that errors have occurred, choose Monitor → PLC Link Status in FPWIN Pro. 
Remote programming of other linked PLCs is not possible. 
 
NOTE
 
To access special data registers and special internal relays, use the PLC-
independent system variables. 
Transmission assurance relays 
•  For PLC link 0: R9060 to R906F (correspond to station no. 1 to 16) 
•  For PLC link 1: R9080 to R908F (correspond to station no. 1 to 16) 
Before using the data from a different station in the network, check to make sure the 
transmission assurance relay for this station is TRUE. 
 
Relay no.  Station no.  System variable name  Conditions for TRUE/FALSE 
R9060 
1 sys_bIsPlcLink0Station1Active 
R9061 
2 sys_bIsPlcLink0Station2Active 
R9062 
3 sys_bIsPlcLink0Station3Active 
R9063 
4 sys_bIsPlcLink0Station4Active 
R9064 
5 sys_bIsPlcLink0Station5Active 
R9065 
6 sys_bIsPlcLink0Station6Active 
R9066 
7 sys_bIsPlcLink0Station7Active 
R9067 
8 sys_bIsPlcLink0Station8Active 
R9068 
9 sys_bIsPlcLink0Station9Active 
R9069 
10 sys_bIsPlcLink0Station10Active 
R906A 
11 sys_bIsPlcLink0Statio11Active 
R906B 
12 sys_bIsPlcLink0Station12Active 
R906C 
13 sys_bIsPlcLink0Station13Active 
R906D 
14 sys_bIsPlcLink0Station14Active 
R906E 
15 sys_bIsPlcLink0Station15Active 
R906F 
16 sys_bIsPlcLink0Station16Active 
 
TRUE:  
•  if the PLC link is normal 
 
FALSE:  
•  if transmission has been 
stopped, or 
•  if a problem has occurred, or  
•  if a PLC link is not being used