Planmeca Sovereign 9
PRE-INSTALLATION REQUIREMENTS
Installation manual
3.7 Fire stopping of the installation site
NOTE The pipe and cable penetrations must be sealed with fire stopping materials. The prod-
ucts given in this section are only examples.
The fire stopping must be performed in accordance with the national regulations.
NOTE Follow the fire stopping products’ installation instructions.
Add fire stopping laminate or mastic (e.g. Intumex LF, Intumex MG) to the pipes as shown on
the figure below.
Fill the floor opening with fire stop sealing compound (e.g. FIREPRO M799 GPG Fire Stop
sealing compound).
Add waterproof material (e.g. Loctite 5366) above the compound and into the cable pipe.
The figure below is an example (installation to a ready-made concrete floor).