EasyManua.ls Logo

Planmeca Sovereign - Installing the Rotating OP Delivery Arm

Planmeca Sovereign
184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Planmeca Sovereign 53
INSTALLING THE PYLON AND ARMS
Installation manual
8.2 Installing the rotating OP delivery arm
Attach the lower pylon according to the instructions given in section 8.1 “Installing the pylon”
on page 48.
Slide the joint support plate to the pylon.
Push the OP delivery arm to its position.

Table of Contents