Planmeca Sovereign 143
INSTALLING THE SIDE DELIVERY ARM
Installation manual
Cut the cable ties that bunch the arm cables and tubes. Route the cables and tubes into the
cuspidor from below the lifting motor. Turn the arm counterclockwise to extreme position and
attach the cables and tubes to the base casting so that they are a bit loose (see figure below).
Connect the arm cables and tubes according to the instructions given in section 8.3 “Installing
the fixed OP delivery arm” on page 65. Connect the side delivery arm potentiometer cable to
the connector P5 on the Mamco PCB located on the cuspidor electronic box. Attach the arm
grounding lead to the grounding point located on the cuspidor.