10.44
9929375 R02 - 2016-2019 GENERAL / GENERAL 4 Service Manual
© Copyright Polaris Industries Inc.
4. Install the seat belt buckles and seat belt shoulder
strap mounts.
TORQUE
Seat Belt Fasteners:
40 lb-ft (54 Nm)
5. Install the fuse box. Refer to “Fuse Box
Replacementpage 11.61” procedure.
6. Install the fasteners holding the rear upper close-off
panel to the vehicle. Torque fasteners to specification.
TORQUE
Rear Upper Close-off Panel Fasteners:
3.5 lb-ft (4.7 Nm)
7. Install the ECU. Refer to “ECU Replacementpage
11.43” procedure.
8. Install the center console top into the vehicle and over
the shift lever. Install the shift boot into the center
console top. Connect the 12 V power receptacles to
the wiring harness.
9. Install the fasteners holding the RH and LH center
console panels to the vehicle. Torque fasteners to
specification.
TORQUE
Center Console Panel Fasteners:
3.5 lb-ft (4.7 Nm)
10.Install the center tunnel access cover and fasteners
securing it to the RH and LH center console panels.
BODY / FRAME