Installation and Initialization MP.11-R Installation and Management
Hardware Installation
21
– Limited Power Source Output per UL/IEC 60950
– CE-marked
– Approved for Power-over-Ethernet
– Rated output, 48 Vdc/0.42 A
– Pinout follows 802.3af standard for mid-span devices
See the following sections for installation instructions:
• Step 1: Choose a Location
• Step 2: Unpack Shipping Box
• Step 3: Assemble the Cable
• Step 4: Determine Proper Mounting Orientation
• Step 5: Assemble Mounting Hardware
• Step 6: Mount the Unit
• Step 7: Plug in the Cables
• Step 8: Power on the Unit
• Step 9: View LEDs
• Step 10: Align the Antenna
• Step 11: Install Documentation and Software