EasyManua.ls Logo

Raven Sidekick Pro User Manual

Raven Sidekick Pro
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
CAN Sidekick Pro Injection for Case
IH 3/4XXX Installation and Operation
Manual
Manual No. 016-0171-592 Rev. E 12/18 E32359
Copyright 2016

Table of Contents

Other manuals for Raven Sidekick Pro

Questions and Answers:

Raven Sidekick Pro Specifications

General IconGeneral
CategoryFarm Equipment
ISOBUS CompatibilityYes
DisplayTouchscreen
ConnectivityWi-Fi, Bluetooth
Battery LifeUp to 10 hours

Summary

Important Safety Information

Agricultural Chemical Safety

Guidelines for safe handling and application of agricultural chemicals.

Electrical Safety

Precautions for safe electrical connections and system operation.

Wire Routing Guidelines

Instructions for safely routing electrical harnesses on the machine.

Hose Routing Guidelines

Instructions for safely routing fluid carrying hoses on the machine.

Introduction to Sidekick Pro System

System Overview

Describes the purpose and function of the Raven Sidekick Pro injection system.

Injection System Components

Lists the main components that make up the injection system.

Required Components and Tools

Lists essential components and tools needed for system installation.

Updates and Feedback

Information on software/documentation updates and providing feedback.

Installation Procedures

Installation Preparation

Steps to prepare the machine and system before physical installation.

Pump and Fill Station Installation

Detailed steps for installing the pump and fill station components.

Tank Support Bracket Installation

Instructions for mounting tank support brackets to the machine.

Mixer Installation

Steps for installing the chemical mixer and its associated plumbing.

Electrical Components Installation

Guide for connecting and routing electrical harnesses and components.

Decal Placement

Instructions for applying operational decals to system components.

Valve Operation

Tank Valve Operation

Explains how to operate the valves for chemical tanks.

Fill Station Operation

Describes how to operate the fill station valves.

Pump Valve Operation

Details on operating single and dual pump valves.

Recirculation Valve Operation

Instructions for operating recirculation valves for single and dual pumps.

Viper 4 (ROS) Initial Set-Up

Raven OS and Section Setup

Initial configuration of the Raven OS and system sections.

System Configuration Tabs

Details on Product, Injection, Pressure, Section, and Alarm settings tabs.

Sidekick Pro Pump Priming and Calibration

Procedures for priming and calibrating the Sidekick Pro injection pump.

CNH Pro 700 Set-Up

Re-Addressing Rate Controllers

Process for re-addressing rate controllers on the CAN bus.

Product Controller Set-Up

Configuring the display to match system settings and equipment.

Alarms Set-Up

Configuration of alarm settings for the sprayer or floater control system.

Pressure Transducer Calibration

Procedure to calibrate all pressure transducers in the sprayer control system.

Injection Pump Calibration

Procedure for remote closed-system calibration of the injection pump.

Troubleshooting

Motor Control Node LED Status Indicators

Interpreting LED status indicators on the Sidekick Pro motor control node.

Sidekick Pro Error Codes and Alarms

Lists common error codes, their possible causes, and solutions.

Replacement Parts

Pumps and Cabling Parts

List of part numbers for pumps, switches, sensors, and cables.

Plumbing Parts List

List of part numbers for mixers, tanks, valves, strainers, and fittings.

Support Brackets and Labels

Part numbers for support brackets, templates, and operation labels.

System Diagrams

Electrical System Diagram

Diagram showing electrical connections and component layout.

Plumbing System Diagram

Diagram illustrating the fluid path and component connections.

Limited Warranty Information

Extended Warranty Information