Fusing
G133 3-76 SM
6. Fusing roller bushing [C] (C-ring x 1) at the front side
7. Tension roller bushings [D] (spring x 1 each)
When re-installing the fusing roller bushing and tension roller bushing
Follow points 3 and 4 explained in "When re-installing the pressure roller" ( "p.3-3
"Pressure Roller and Pressure Roller Bearing"")
3.10.6 TENSION ROLLER
1. Fusing unit ( "p.3-3 "Fusing Unit"")
2. Fusing right cover, fusing upper cover ( "p.3-3 "Fusing Lamp"")
3. Pressure Roller ( "p.3-3 "Pressure Roller and Pressure Roller Bearing"")
4. Tension roller bushings ( "p.3-3 "Fusing Roller Bushing and Tension Roller
Bushing"")