Fusing
SM 3-79 G133
Replacement
Adjustment
11. Remove the ferrite roller actuator [I] ( x 1), while holding the shaft with the pliers.
12. Bushing holder [J], heating roller bushing [K], gear [L]
13. Gear [M] ( x 1), bushing holder [N] and heating roller bushing [O]
14. Heating roller [P]
When re-installing the fusing belt, heating roller, fusing roller and
heating roller bushing
1. Apply three spots of "Barrierta S552R" (the diameter of each spot must be about 3 mm
in diameter, and approximately 0.1 g in weight) to the front shaft of the fusing roller at 2
- 3 mm from the notch [A].
2. Apply three spots of "Barrierta S552R" (the diameter of each spot must be about 3 mm