EasyManua.ls Logo

Ridder RW800 - Page 21

Ridder RW800
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
❷ Do the standard bolt-installation (SBI) of the motor gearbox on the applicable mounng plate
or an alternave.
Minimum Screw-in depth (SID)
• For the ghtening torque of the used xing bolts a minimum screw-in depth (SID) is necessary.
Refer to the illustraons (Standard Bolt-Installaons [SBI]) that follow.
• Possibly xing bolts with more length are necessary if a larger sheet thickness is used!
• Tighten the bolts crosswise and gradually with the correct ghtening torque (Nm).
Standard Bolt-installations (SBI)
Make sure that the drive unit is installed in a stable condion. The
structure must have sucient strength for the applied forces.
Make sure that easy access to the cover of the RW motor-gearbox is
possible for all work.
Installaon OUTDOORS of RW motor-gearboxes is only permied
with PROTECTION from RAIN (protecon covers or such) at a
minimum temperature of 0 °C. Problems with moisture and/or the IP
protecon rang (if applicable) must be prevented.
SID (2x):
≥ 11 mm!
M10 x 20 (2x)
M10 (2x)
45 Nm
RW45–800
SID (4x):
≥ 14 mm!
SID (3x):
≥ 16 mm!
M10 x 25 (3x)
M10 (3x)
M12 x 25 (4x)
M12 (4x)
- 45 Nm - 80 Nm
Ridder Drive Systems B.V.
T +31 (0)341 416 854 - F +31 (0)341 416 611 - I ridder.com
21

Table of Contents