PACK 5040M/6050M
PACK 5040A/6050A
5.8. CARRIER TUNNEL ADJUSTMENT
Proceed as indicated.
‒ Ad
ust the strain usin
th
(A) re
ulatin
s
stem.
he work must be carried out in e
ual measure on both screws.
Durin
rocessin
, the s
stem must remain centred with res
ect to the s
ools.
| Important
DO NOT intervene on the screws in a different manner, so as to avoid losing the original setting made during
the assembl
hase.
Lockin
tunnel carrier rollers.
‒ This operation is necessary if polyethylene film is used to avoid the rotation of the rollers from tearing
the
acka
in
.
‒ Full
ti
hten th
(B) screws to s
ace th
(C) su
orts from th
(D) rollers.
English