Roche Diagnostics
Operatorโs Manual ยท Version 3.1 E-35
Cedex Bio System 13 ISE operation
Replacing electrodes
18
Place the Activator, ISE Deproteinizer, ISE Etcher, ISE Solution 1, and ISE
Solution 2 on the sample area positions indicated on the screen.
19
Press to confirm the placement and to start the action.
The system performs the Electrode Service maintenance action.
20
Press to perform the main calibration.
A message will inform you when the action is complete.
21
When the system is in Standby status, remove the Activator, ISE Deproteinizer,
ISE Etcher, ISE Solution 1, and ISE Solution 2 from the sample area.
22
Press .