Roche Diagnostics
E-56 Operator’s Manual · Version 3.1
14 ISE maintenance Cedex Bio System
ISE maintenance actions
12
Align the tubing connector plate with the tube connectors on the ISE unit.
13
Carefully close the peristaltic pump lid.
The tube connector plate is automatically pushed into the tube connectors of the
ISE unit.
14
Close the ISE cover.
15
Press to confirm completion of the action.
The system first performs the Prime ISE Reference and Calib. maintenance
action, then Initialize ISE Unit.
A message will inform you when the maintenance actions are complete.
16
Remove the Activator from the sample area.
17
Press .