EasyManuals Logo

Roche Cedex Bio System User Manual

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #455 background imageLoading...
Page #455 background image
Roche Diagnostics
Operatorโ€™s Manual ยท Version 3.1 E-65
Cedex Bio System 14 ISE maintenance
ISE maintenance actions
12
Open the cover of the peristaltic pump.
13
Push the pump towards the back of the instrument.
14
Disengage the tube connector plate.
15
Remove all pinch valve caps and clamps, store them in secure place.
e
See Removing the pinch valve caps and clamps on page E-58.
16
Close the ISE cover.
17
Shut down the system and switch off instrument.
18
Disconnect the ISE power supply from the wall socket.
19
Switch on instrument.
On the Overview tab, the ISE icon is deactivated (grey).
A Cover of peristaltic pump
Figure E-18
A Connector plate
Figure E-19
A
A

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Roche Cedex Bio System and is the answer not in the manual?

Roche Cedex Bio System Specifications

General IconGeneral
BrandRoche
ModelCedex Bio System
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals