Rockwell Automation Publication 750-TG100B-EN-P - June 2019 279
Power Bay Components Chapter 9
Install the Torque Accuracy Module
Install the torque accuracy module in the reverse order of removal.
When installing the fiber-optic cable:
1. Without bending the cable to a radius less than 50 mm (2 in.), fully insert
the fiber-optic cable into the transceiver.
2. Insert the transceiver and fiber-optic cable into the port on the board, until
you hear an audible ‘click.
DC Bus Conditioner
Replacement
Replace the DC bus conditioner with kit catalog number
20-750-MDCBUS-COND.
Remove the DC Bus Conditioner
Follow these steps to remove the DC bus conditioner.
1. Review the Product Advisories on page 14
.
2. Remove power from the system. See Remove Power from the System on
page 15
.
3. Open the corresponding power bay enclosure door.
4. If present, remove the guards from the enclosure. See Guard Removal on
page 235
.
IMPORTANT
Minimum inside bend radius for fiber-optic cable is 50 mm
(2 in.). Any bends with a shorter inside radius can
permanently damage the fiber-optic cable. Signal
attenuation increases as inside bend radius is decreased.