2015-2017 5.0L Mustang Phase 1/2 RHD ROUSHcharger Kit
SECTION A – DISASSEMBLY
1316-RHD-AA 12152016 19 800.59.ROUSH
38. Remove the brake boost vacuum hose/line from
the vehicle and set it aside. This line will be
modi ed.
SECTION A
HOSE 1
HOSE 2
HOSE 4
SECTION B
HOSE
5
HOSE
3
39. Remove the LH heater hose support bracket and
fuel rail cover from the LH side of the cylinder
head.
40. Remove the two (2) nuts and support bracket that
retained the RH heater hose above the RH fuel
rail. This hardware will not be reused. Remove the
support bracket and fuel rail cover from the RH
cylinder head.
41. Disconnect the heater feed and return hoses
located at the front of both the LH and RH
cylinder head intake anges.