9. Commissioning & Recommissioning
Installer reference guide / Mono tank integrated type 176
9.5 Commissioning
Pre-test operation check
Pre-test Operation Checks
Water filled Yes No
Glycol / Brine added (mono)
Yes No
System water pressure (bar)
bar
Air purged
Yes No
Isolating valves fitted (supply and return side)
Yes No
Manometer installed
Yes No
Secondary circuit pump(s) installed
Yes No
Expansion vessel isolating valve installed and opened (if required)
Yes No
bar
Expansion vessel size in volume (no calculation check by commissioning engineer)
bar
Combination inlet valve installed
Yes No
Tundish installed and connected to drain
Yes No
Water temperature in operation range for heating (20°C > Tw2 < 55°C), if needed preheat by BUH/BSH
Yes No
S-NET connected and ready to collect data
Yes No
Additional heat sources max. supply temperature are limited to max. 70°C
Yes No
Pipe diameter space heating
mm
Main material
Steel Copper Plastic
Pipe diameter DHW
mm
Main material
Steel Copper Plastic
Water quality pH(25°)
Hardness mg/L
Additives (Inhibitors) used
Corrosion inhibitor used