82 S&C Instruction Sheet 461-509
Quick Installation Checklist
Pre-Installation
□ Examine the shipment(s) and make sure it includes:
• The communications gateway
• Mounting hardware for securing the gateway to the pole
• An ac power cable
Also, make sure the recloser uses firmware v1.6 or later for Extended Open Interval
functionality.
□ Always read the Danger and Warning labels.
□ Follow your company’s PPE guidelines and standard operating procedures.
Installation
□ For the communications gateway, verify that:
• The eld-area-network radio is congured, installed, and connected.
• The communications gateway is mounted securely on the pole.
• The communications gateway is grounded.
• The ac power cable is connected and control power is available.
• The remote antenna (if applicable) is installed and connected.
• The communications gateway is locked for security, when congured and opera-
tional.
□ For the TripSaverII reclosers, verify that:
• The recloser is set to Gateway mode.
• The reclosers are powered.
After the above steps are complete, proceed with the following if they have not already
been done:
□ Pair the communications gateway with TripSaverII recloser(s).
□ Congure the communications gateway. To congure the communications gateway in
the service center, use the three-prong ac power cable (cat. number 007-002101-01/02).