EasyManua.ls Logo

Schiller BP-200 plus - Maintenance; Maintenance Intervals

Schiller BP-200 plus
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Maintenance
6.1 Maintenance Intervals
Page 42
BP-200 plus
Art. no.: 2.510701 rev.: c
6 Maintenance
6.1 Maintenance Intervals
All maintenance tests and intervals are subject to verification.
All software controlled devices have undergone a software risk analysis to minimise
any hazards connected to software defects.
Maintenance work not described in this chapter may only be accomplished by a
qualified technician authorised by SCHILLER.
The following table indicates the intervals and responsibilities of the maintenance
work required.
Interval Maintenance Responsible
Every 6 months Visual inspection of the unit, cables. tubes and cuff
Keys test (see next page).
« User
Every 12 months All checks performed at the six month interval.
Functional and safety checks and inspections according to the in-
structions in the service handbook.
NIBP calibration check.
ECG check.
•SpO
2
check.
« Service staff authorised by
SCHILLER

Table of Contents