Maintenance
58 14.00 | SRU-plus 20 - 60 | Assembly and Operating Manual | en | 389443
8 Maintenance
8.1 Notes
DANGER
Danger of explosion in potentially explosive areas!
l
Observe supplementary sheet for products with explosion-
resistant versions "SRU-plus -...-EX".
Original spare parts
Use only original spare parts of SCHUNK when replacing spare and
wear parts.
8.2 Maintenance interval
CAUTION
Material damage due to hardening lubricants!
Lubricants harden more quickly at temperatures above 60°C,
leading to possible product damage.
l
Reduce the lubricant intervals accordingly.
All sizes
Interval Maintenance work
daily Visually inspect the function of the shock
absorbers, }8.4.1 [/60].
SRU-plus 20 - 40
Interval
[Mio. cycles]
Maintenance work
2 Clean all parts thoroughly, check for damage and
wear, if necessary replace seals and wearing
parts,}8.7 [/67].
2 Treat all grease areas with lubricant, }8.3 [/59].
2 Check that the shock absorbers are working, if
necessary replace shock absorber, }8.6 [/64].
SRU-plus 50 - 60
Interval
[Mio. cycles]
Maintenance work
1 Clean all parts thoroughly, check for damage and
wear, if necessary replace seals and wearing
parts,}8.7 [/67].
1 Treat all grease areas with lubricant, }8.3 [/59].
1 Check that the shock absorbers are working, if
necessary replace shock absorber,}8.6 [/64].