EasyManua.ls Logo

Shark 100B - Page 10

Shark 100B
194 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Doc# E145701 TOC - 2
Table of Contents
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
2.2: Specifications 2-9
2.3: Compliance 2-15
2.4: Accuracy 2-16
3: Mechanical Installation 3-1
3.1: Introduction 3-1
3.2: ANSI Installation Steps 3-4
3.3: DIN Installation Steps 3-5
3.4: Shark® 100T Transducer Installation 3-6
4: Electrical Installation 4-1
4.1: Considerations When Installing Meters 4-1
4.2: CT Leads Terminated to Meter 4-4
4.3: CT Leads Pass Through (No Meter Termination) 4-5
4.4: Quick Connect Crimp-on Terminations 4-6
4.5: Voltage and Power Supply Connections 4-7
4.6: Ground Connections 4-7
4.7: Voltage Fuses 4-7
4.8: Electrical Connection Diagrams 4-8
4.9: Extended Surge Protection for Substation Instrumentation 4-21
5: Communication Installation 5-1
5.1: Shark® 100/50 Meter Serial Based Communication 5-1
5.1.1: IrDA Port (Com 1) 5-2
5.1.2: RS485/KYZ Output Com 2 (485P Option) 5-3
5.1.2.1: Using the Unicom 2500 5-7

Table of Contents

Other manuals for Shark 100B

Related product manuals