EasyManua.ls Logo

Siemens NXAIR - Page 181

Siemens NXAIR
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Closing the connection compartment / connection duct
110-0084.9 / 15 NXAIR / 40 kA 181
Fig. 261: 2 bolted joints on base frame at the front
Tighten the lateral bolts M8x20 at the vertical partition and the base frame hand-tight. Tighten
the bolts with a tightening torque of 25 Nm. Proceed in the same way on the other side.
Fig. 262: 6 lateral bolted joints on partition and base frame
Tighten the upper bolts M8x20 at the vertical partition hand-tight. Tighten the bolts with a
tightening torque of 25 Nm.
Fig. 263: 4 bolted joints on partition
Fold the air guide downwards.

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals