Closing the connection compartment / connection duct
188 NXAIR / ≤ 40 kA 110-0084.9 / 15
Fig. 273: 3 bolted joints at the cable connections (central joint covered)
Install the vertical partition in the connection compartment.
Fix the partition by screwing the bolts hand-tight:
• 8 bolts M8x20 with contact washers and plain washers size 8 acc. to ISO 7093
Tighten the bolts with a tightening torque of 25 Nm.
Fig. 274: 8 bolted joints on partition
Install the protection plate of the switching-device compartment.
Fix the protection plate by screwing the nuts hand-tight:
• 4 nuts M8 with contact washers
Tighten the nuts with a tightening torque of 25 Nm.