EasyManua.ls Logo

Siemens NXAIR - Page 89

Siemens NXAIR
222 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembling the panels
110-0084.9 / 15 NXAIR / 40 kA 89
Remove 2 hexagon head bolts M8x20 each from the upper and the lower wiring duct cover on
the left inner side of the panel in the switching-device compartment.
Remove the upper and the lower wiring duct cover from the switching-device compartment.
Fig. 107: Removing the wiring duct cover
INFORMATION
The necessary bolting elements are delivered in a bag unit together with each panel.
The bag units are attached to the sheet-steel enclosure of the busbar compartment.
For bolting the panels together, use bag unit with order number
110-0788.3.
After removing the connecting elements, the packing materials of the bag
unit must be disposed of in an environmentally compatible way.
The bag units can be re-ordered individually.
Take 7 bolts M8x25 (hexagon head bolt with contact washer) and 7 plain washers size 8
according to ISO 7093 from the bag unit supplied, and screw them from the left inner side of
the switching-device compartment into the adjacent switching-device compartment.
(1)
Hexagon head bolt M8x20
(2)
Upper wiring duct cover
(3)
Lower wiring duct cover

Table of Contents

Other manuals for Siemens NXAIR

Related product manuals