Page 156 SITRANS LUT400 (HART) – OPERATING INSTRUCTIONS A5E33329501
mmmmm
Parameters
2.7.2.2.4. Peak 1 End Time
Sets the end time of the high energy cost period 1.
Used in conjunction with
2.7.2.2.3.Peak 1 Start Time
to define the
high cost period.
For instructions on how to edit parameters with a string editor, see
Using the string editor:
on page 188.
2.7.2.2.5. Peak 2 Start Time
Sets the start time of the high energy cost period 2.
Used in conjunction with
2.7.2.2.6.Peak 2 End Time
to define the high
cost period.
2.7.2.2.6. Peak 2 End Time
Sets the end time of the high energy cost period 2.
Used in conjunction with
2.7.2.2.5.Peak 2 Start Time
to define the
high cost period.
2.7.2.2.7. Peak 3 Start Time
Sets the start time of the high energy cost period 3.
Used in conjunction with
2.7.2.2.8.Peak 3 End Time
to define the high
cost period.
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, e.g. for
5:30pm, set parameter to 17:30)
Default: 00:00
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, e.g. for
5:30pm, set parameter to 17:30)
Default: 00:00
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, e.g. for
5:30pm, set parameter to 17:30)
Default: 00:00
Values
Range: 00:00 to 23:59
Format: HH:MM (24 hour format, e.g. for
5:30pm, set parameter to 17:30)
Default: 00:00