EasyManua.ls Logo

Sime GO 18 BF - 6.13.2 EMPTYING Operations

Sime GO 18 BF
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
69
EN
6.13.2 EMPTYING operations
Domestic hot water circuit:
close the domestic hot water circuit isolation valve
(prearranged in installation)
open one or more than one hot water valve to fill and bleed the
domestic hot water circuit.
Boiler:
loosen the automatic bleed valve (3)
close the heating circuit isolation valves (prearranged in
installation)
check that the filling valve (4) is shut-off
connect a rubber hose to the boiler drain valve (7) and open it
when it has fully emptied, close the drain valve (7)
close the automatic bleed valve (3).
4
3 7
Fig. 45

Table of Contents

Related product manuals