13 - 23
14. Remove the hardware (A, Figure 25) securing the
engine to the frame.
15. Connect a suitable lifting device to the lift rings on the
engine, and raise the engine slowly from the frame,
until the drive shaft front flange (rear of engine) is
cleared. Move the engine to a suitable work area.
Figure 25. Engine Mounting Hardware
A. Hardware
13 Engine Removal & Installation
Kawasaki - Engine Removal
A
16. Refer to your Kawasaki Engine Operator Manual or
contact your Kawasaki Engine Distributor for specific
information on the disassembly, repair, reassembly,
and adjustment of the Kawasaki Liquid Cooled V-
Twin 20 HP Models.