Section 1 – Scheduled Maintenance Scheduled Maintenance Inspections
8
Wire ropes (B)
â–ª
There are no loose or missing parts, and there is
no visible damage.
â–ª
All fasteners are correctly tightened.
â–ª
Make sure that the nuts are correctly tightened
and are locked together.
â–ª
Make sure that there are no gaps between the
springs. For the wire rope tension procedure,
refer to 5.4-19 Proper Wire Rope Tension.
With Gaps No Gaps
Cable Disc Springs
8
8
To order go to Discount-Equipment.com

Table of Contents

Other manuals for Skyjack SJ82 T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ82 T and is the answer not in the manual?

Skyjack SJ82 T Specifications

General IconGeneral
BrandSkyjack
ModelSJ82 T
CategoryBoom Lifts
LanguageEnglish

Related product manuals