6.
MountthePrimaryUnit:
a. LiftthePrimaryUnitfromitssides.
b. Alignthetwoindentationsintheenclosurewiththetwotriangularmountingtabsofthebracket,
andlowertheunituntilitrestsonthebracketevenly(seeFigure20).
c. Insertthesuppliedscrewthroughtherightsideoftheheatsinkandintothebracket.
Figure 20: Hanging units
7.
MounttheSecondaryUnit(s):
l ThereisnospecificorderforhangingtheSecondaryUnits.
Wheninstallinga2unitinverter,mounttheSecondaryUnittotheleftofthePrimaryUnit.
l LifttheSecondaryUnit(s)fromthesides,orholditatthetopandbottomoftheunittolift
intoplace.
l Alignthetwoindentationsintheenclosurewiththetwotriangularmountingtabsofthe
bracket,andlowertheunituntilitrestsonthebracketevenly(seeFigure20).
l Insertoneofthesuppliedscrewsthroughtheoutersideoftheheatsinkandintothebracket.
Tightenthescrewswithatorqueof4.0N*m/2.9lb.*ft.
8.
SecuretheConnectionUnittothewall:
l Markthelocationofthebracketscrewanddrillthehole
l Fastenthebracketusingastandardbolt
l Verifythatthebracketisfirmlyattachedtothemountingsurface.
Figure 21: Connection Unit bracket