WARNING!
The inverter must be connected to a dedicated AC branch circuit with a maximum Overcurrent
Protection Device (OCPD) of 40 A.
Les onduleurs doivent être connectés à un branchement AC dédié avec un disjoncteur de 40A.
CAUTION!
This unit must be operated under the specified operating specifications, as described in the latest
technical specification datasheet provided with the unit .
Cette unité doit être utilisée selon les spécifications de fonctionnement, comme décrit dans la dernière
fiche technique des spécifications, disponible sur le site web de SolarEdge,
http://www.solaredge.us/groups/us/products/overview.
NOTE
The StorEdge Connection Unit is NEMA type 3R rated . Unused conduit openings and glands should be
sealed with appropriate seals.
CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting techniques, and if required - a
lifting aid when removing or replacing.
Objet lourd. Pour éviter la fatigue musculaire ou des blessures au dos, utilisez des techniques de levage
appropriées et, si cessaire - un auxiliaire de levage lors du retrait ou du remplacement.
NOTE
Use only copper conductors rated for a minimum of 75°C/167°F.
NOTE
This inverter is provided with an IMI (Isolation Monitor Interrupter) for ground fault protection.
NOTE
The symbol appears at grounding points on the SolarEdge equipment. This symbol is also used in
this manual.
NOTE!
l Building or structures with both utility service and a PV system, complying with NEC 690.12, shall
have a permanent plaque or directory including the following wording: PHOTOVOLTAIC SYSTEM
EQUIPPED WITH RAPID SHUTDOWN. The term “PHOTOVOLTAIC” may be replaced with
“PV.The plaque or directory shall be reflective, with all letters capitalized and having a minimum
height of 9.5mm (3/8 in.) in white on red background.
l Attention -The system status indicator shall be installed in a location in close proximity to the
system actuator, where the indication of safe shutdown can be clearly seen.
l This rapid shutdown system is required to be provided with an actuating device or a status
indicator which shall be installed in a location accessible to first responders, or be connected to an
automatic system which initiates rapid shutdown upon the activation of a system disconnect or
activation of another type of emergency system.
l Additionally, in a prominent location near the actuator device the end use installation shall be
provided with a permanent marking including the following wording: PHOTOVOLTAIC SYSTEM
EQUIPPED WITH RAPID SHUTDOWN . The term “PHOTOVOLTAIC” may be replaced with
“PV”. The plaque or directory shall be reflective, with all letters capitalized and having a minimum
height of 9.5mm (3/8 in.) in white on red background.
IMPORTANTINVERTER SAFETYINSTRUCTIONS
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.2
7

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge storedge and is the answer not in the manual?

SolarEdge storedge Specifications

General IconGeneral
BrandSolarEdge
Modelstoredge
CategoryInverter
LanguageEnglish

Related product manuals